Can I Get Development Details for Sattva Ekatra?

Featured Image of Can I Get Development Details for Sattva Ekatra?


Yes, Sattva Ekatra development details are available from the project filing and approved layout data. Sattva Ekatra is a RERA-approved plotted development on 24.36 acres at Thippapura Village, Doddaballapura Taluk, Bengaluru Rural District. The project has 502 residential plots, 1 CA or commercial plot, 12 m and 9 m internal roads, parks, open spaces, a CA site and planned lifestyle amenities.

The project is approved by Doddaballapur Planning Authority under plan number DPA/TP/LAO/30/25-26. The plan approval date is 17 July 2026. The Karnataka RERA number is PRM/KA/RERA/1250/301/PR/180926/008945. The RERA approval date is 18 September 2026. The project start date is 1 October 2026, and possession is planned for 29 March 2029.

Sattva Ekatra Development Overview


Detail Information
Project Name Sattva Ekatra
Project Type Plotted development
Location Thippapura Village, Doddaballapura Taluk
Total Land Area 24.36 acres
Total Sites 503 sites
Residential Plots 502 plots
CA or Commercial Plot 1 plot
Planning Authority Doddaballapur Planning Authority
Approved Plan Number DPA/TP/LAO/30/25-26
RERA Number PRM/KA/RERA/1250/301/PR/180926/008945
Development Status New launch, ongoing
Possession Date 29 March 2029

Sattva Ekatra is not an apartment project. It does not have towers, floors or BHK units. The development work is for a plotted layout. So the main work includes plot formation, road formation, drainage, water lines, electrical work, open spaces, plantation and common amenities.

Sattva Ekatra Current Development Status


Sattva Ekatra is currently in the new launch stage. Bookings are open. The RERA filing shows the project as ongoing, with 0% development complete at the time of filing.

At the site level, the marketing office, entrance gate, branded boundary wall, visitor parking and landscaping are already available. Plot-level layout works are scheduled from 1 October 2026. This includes plot formation and core infrastructure work inside the layout.

Sattva Ekatra Development Timeline


Work Stage Timeline
Project Start Date 1 October 2026
Formation of Plots 1 October 2026 to 28 February 2027
Roads, Footpaths, Drainage and Electrical Poles 13 February 2027 to 10 November 2027
Power Supply, Transformer and Substation 4 April 2027 to 11 October 2027
Plantation 23 February 2027 to 23 June 2027
Miscellaneous Project Work 1 October 2026 to 19 March 2029
Proposed Completion 19 March 2029
Possession Date 29 March 2029

This timeline shows that the first stage is plot formation. After that, road and service works will move in phases. The final handover is planned for March 2029.

Land Development Details


Sattva Ekatra is planned on 98,590 sq. m. of land, which is about 24.36 acres. The brochure mentions the sanctioned area as 24 acres and 14.5 guntas. The land is already converted for residential use by the Deputy Commissioner, Bangalore Rural District.

The land conversion orders are dated 13 November 2025 and 20 November 2025. This is important because residential plot development needs proper land conversion. The project khatha is under Majarahosahalli Grama Panchayath, Thippapura Village.

Sattva Ekatra Land Use Development


Land Use Area Share
Residential plot area 53,851 sq. m. 54.6%
Roads 29,830 sq. m. 30.3%
Parks and open spaces 9,972 sq. m. 10.1%
CA site 4,937 sq. m. 5.0%
Total land area 98,590 sq. m. 100%

The land use shows how the layout is divided. More than half of the project land is used for residential plots. Roads take 30.3% of the land. Parks and open spaces take 10.1%. The CA site takes 5%.

The RERA open area figure is 44,739 sq. m., or about 45% of the total site. This includes roads, parks, open spaces and the CA site. So it should be understood as total open area, not only green space.

Plot Development in Sattva Ekatra


Sattva Ekatra has 502 residential plots. The project has regular plot sizes and odd-dimension plots. The plot formation work is scheduled from 1 October 2026 to 28 February 2027.

Plot Type Area Number of Plots
20x30 600 sq. ft. 81 plots
30x40 1,200 sq. ft. 208 plots
30x45 1,350 sq. ft. 10 plots
30x50 1,500 sq. ft. 44 plots
30x60 1,800 sq. ft. 20 plots
Odd-dimension plots About 625 to 1,200 sq. ft. 139 plots

The 30x40 plot is the largest category in the project. The 20x30 plot gives the lowest entry size. The 30x60 plot is the largest regular plot size. The available data does not show 40x60 plots.

Internal Road Development


Roads are a major part of Sattva Ekatra development. The project has 29,830 sq. m. marked for roads. This is 30.3% of the total land area.

The internal roads are planned with 12 m and 9 m widths. This is about 40 ft and 30 ft. These roads support plot access, vehicle movement and future home construction. Road width also affects plot facing and daily movement inside the layout.

Roads, footpaths, drainage and electrical poles are planned between 13 February 2027 and 10 November 2027. Buyers should check the exact road width near their selected plot before booking.

Drainage and Utility Development


Sattva Ekatra development includes drainage and basic service infrastructure. The project filing mentions domestic water supply, storage and distribution. It also mentions domestic STP and recharge pits.

Drainage work is planned along with road and footpath work. This is important in a plotted layout because each future house will depend on proper road-level service lines. Buyers should check the final utility plan before starting house construction.

Power and Electrical Development


Power supply work in Sattva Ekatra includes transformer and substation planning. The power supply, transformer and substation work is planned from 4 April 2027 to 11 October 2027.

Electrical poles are also part of the road and service development stage. Buyers should check whether the selected plot has easy access to electricity points when the layout development is complete. This becomes important during house construction.

Water Supply Development


The water source for Sattva Ekatra is Gram Panchayath or Doddaballapur local authority supply. The development plan includes domestic water storage and distribution.

For plotted developments, water planning is very important. Each plot owner will need water access after registration and during home construction. Buyers should ask about water connection process, meter setup and user charges before starting construction.

Park and Open Space Development


Sattva Ekatra has 9,972 sq. m. of parks and open spaces. Plantation work is planned from 23 February 2027 to 23 June 2027. These areas will support outdoor use inside the plotted layout.

The project also has a CA site of 4,937 sq. m. The brochure mentions space for a clubhouse. This area is planned for community use and common facilities. Buyers should check the final layout map to understand how close their plot is to parks, roads and the CA site.

Sattva Ekatra Amenities Development


Sattva Ekatra amenities are planned for a plotted community. The available project data mentions space for a clubhouse, kids’ play area, outdoor gym, sitting court, open all-purpose playground, reflexology plaza, yoga and meditation lawn and pet park.

These amenities are planned project features. Buyers should check the development stage during site visit. Since the project is still in the early development stage, amenity completion will follow the project schedule.

Project Cost for Development


The total project cost filed for Sattva Ekatra is Rs. 302.3 crore. This includes land cost and development cost.

Cost Head Amount
Land cost Rs. 251.84 crore
Development cost Rs. 50.46 crore
Total project cost Rs. 302.3 crore

The development cost is Rs. 50.46 crore. This amount is linked to layout development works like roads, services, power, drainage, plantation and other project infrastructure.

Approvals Linked to Development


Sattva Ekatra has key approvals needed for plotted layout development. The project has DPA layout approval, RERA approval, land conversion orders and project khatha.

The project also has NOCs and clearances mentioned in the filing, including BESCOM, water NOC and KSPCB clearance. SEIAA is not applicable as per the available data. These approvals support the planned development work.

Final Answer


Sattva Ekatra development details show a 24.36-acre plotted layout with 502 residential plots, 1 CA or commercial plot, 12 m and 9 m roads, parks, open spaces, water supply planning, drainage, power infrastructure and planned amenities. The project is approved by Doddaballapur Planning Authority and registered under Karnataka RERA.

The main development works start from 1 October 2026. Plot formation is planned first. Road, drainage, electrical and power works are planned through 2027. Plantation and common area works will follow the schedule. The proposed completion date is 19 March 2029, and possession is planned for 29 March 2029.

FAQs


1. What is the development status of Sattva Ekatra?

Sattva Ekatra is a new launch and ongoing plotted development. The RERA filing shows 0% development complete at filing.

2. When will Sattva Ekatra development work start?

The project start date is 1 October 2026. Plot formation is planned from 1 October 2026 to 28 February 2027.

3. What type of project is Sattva Ekatra?

Sattva Ekatra is a plotted development. It has residential plots, roads, open spaces and a CA site.

4. How many plots are there in Sattva Ekatra?

Sattva Ekatra has 502 residential plots and 1 CA or commercial plot.

5. What are the internal road widths in Sattva Ekatra?

The internal roads are planned at 12 m and 9 m width.

6. What amenities are planned in Sattva Ekatra?

The project has planned amenities like clubhouse space, kids' play area, outdoor gym, sitting court, playground, reflexology plaza, yoga lawn and pet park.

7. What is the development cost of Sattva Ekatra?

The development cost filed for Sattva Ekatra is Rs. 50.46 crore.

8. When is Sattva Ekatra possession planned?

Sattva Ekatra possession is planned for 29 March 2029.

Sattva Ekatra Blog


Enquiry
Enquire Now